Terms and definitions 5
abbreviations in use 8
introduction 9
1 target and necessity to implement targeted activities 11
2 General characteristics 13
2.1 actual state of environment in the construction area 13
2.1.1 Existing sources of anthropogenic influence 13
2.1.2 Climate and atmospheric air 16
2.1.3 Surface and subsurface water 17
2.1.5 Flora and Fauna 20
2.1.6 Landscape 23
2.2 health state of personnel 23
2.3 concise description of contract areas 24
Термины и определения 29
употребляемые сокращения 33
вВЕДЕНИЕ 34
1 цель и необходимость реализации намеченной деятельности 36
2 общие характеристики 38
2.1 фактическое состояние окружающей среды в районе строительства 38
2.1.1 Существующие источники антропогенного воздействия 38
2.1.2 Климат и атмосферный воздух 41
2.1.3 Поверхностные и подземные воды 43
2.1.5 Растительный и животный мир 46
2.1.6 Ландшафт 49
2.2 Состояние здоровья персонала 50
2.3 краткое описание контрактных участков 50
Table 1
| -
Group hydrocarbon composition of stable condensate
|
Table 2
| -
Geological structure for process designs
|
Table 3
| -
Initial data for process designs
|
Table 4
| -
Blanket gas blend composition
|
Table 5
| -
Gas and condensate recovery in Khauzak and Shady
|
Table 6
| |
Table 7
| -
Design duty of BCS according to gas extraction pattern of 3,0 bln m3/year
|
Table 8
| -
Indicators under field base general layout
|
Table 9
| -
Process parameters of waste water treatment plants
|
Table 10
| -
Technical and economic indicators
|
Table 11
| |
Table 12
| -
Section 1. Pollutants origin
|
Table 13
| |
Table 14
| -
Section 3. Powder-gas (disposal) plants performance
|
Table 15
| -
Section 4. Total emissions of pollutants
|
Table 16
| -
Meteorological characteristics and coefficients
|
Table 17
| -
Impact of atmospheric emissions of pollutants on the present state of things, total enterprise development and time to reach MPD (according to sources)
|
Table 18
| -
Impact of atmospheric emissions of pollutants on the present state of things, total enterprise development and time to reach MPD (according to ingredients)
|
Table 19
| -
Total standards for pollutants emission into the atmospheric air
|
Table 20
| -
Plan of air-protective measures
|
Table 21
| -
Reduction measures for pollutants emissions during UMC
|
Table 22
|
- Schedule of compliance monitoring of harmful atmospheric emissions
|
Table 23
| -
Water consumption and disposal norms calculation
|
Picture 1
| -
Khauzak and Shady site plan
|
Picture 2
| -
Khauzak and Shady location map
|
Picture 3,4,5,6
| |
Picture 7
| -
Khauzak and Shady XV-HP horizon confining layer subsurface map
|
Picture 8
|
- Pay section geologic profiles on the line of wells 302, 301, 14-Х, 10-Х, 13-Х, 13-СД
|
Picture 9
| |
Picture 10
| |
Picture 11
| -
Gas and condensate cumulative production
|
Picture 12
| -
Running well stock and average gas flow rate
|
Picture 13
| -
Principal scheme of gas collection at Khauzak and Shady of Dengizkul deposit
|
Picture 14
| -
Multiple well platform flowsheet
|
Picture 15
| |
Picture 16
| |
Picture 17
| -
Gathering station flowsheet
|
Picture 18
| -
Gathering station general layout
|
Picture 19
| -
Gas pipeline connection diagram
|
Picture 20
| -
Condensate pipe connection diagram
|
Picture 21
| |
Picture 22
| -
Field base and housing settlement general layout
|
Pictures 23-37
| -
Calculation of maximum ground level concentrations
|
Picture 38
| |
Picture 39
|
- General layout for GS and wastes location
|
Picture 40
| -
Field base general layout and wastes location
|
Picture 41
| |